Green Coast Hotel - Europe
Tirana General Contracting is currently contributing to the development of the Green Coast Hotel project, located within the prestigious Green Coast Resort in Palasë on the Albanian Riviera. This landmark development represents one of the most ambitious tourism and hospitality investments in Albania, designed to establish the region as a premier international destination along the Ionian coastline.
Positioned between the mountains and the sea, the Green Coast development is a large-scale resort destination that integrates luxury hospitality facilities, villas, leisure spaces, and modern infrastructure within a carefully planned coastal environment. The project reflects a vision of sustainable Mediterranean architecture combined with world-class tourism development.
Construction and Development Scope
Within this multi-million-dollar project, Tirana General Contracting is actively involved in delivering a range of construction and technical services aligned with the company’s expertise in large-scale developments.
Structural Construction Works
Tirana GC is carrying out structural construction works that form part of the core building framework of the hotel development. These works require strict engineering discipline and precision to ensure the structural stability, durability, and long-term performance of the building.
Mechanical, Electrical and Plumbing (MEP) Installations
The company is also responsible for the implementation of MEP services, which represent the technical backbone of modern building infrastructure. These systems include mechanical installations, electrical distribution networks, and plumbing systems that support the operational efficiency, safety, and environmental comfort of the hotel.
Interior Fit-Out Works
As the project progresses, Tirana GC is delivering general fit-out works, helping shape the interior spaces of the development. These works contribute to the functionality, quality, and architectural character expected within a high-end hospitality environment.
Flooring, Tiling and Surface Finishes
Precision flooring and tile installation works are also being carried out across designated areas of the project, ensuring durable surfaces and refined finishes that complement the architectural design of the development.
Interior and Exterior Finishing Works
In addition, Tirana GC is undertaking interior and exterior finishing works, including painting and surface treatments designed to enhance both the visual quality and long-term durability of the building in a coastal climate.
The Green Coast Hotel project highlights Tirana General Contracting’s capacity to contribute to large-scale international hospitality developments. By combining structural construction, technical installations, and finishing works, the company continues to play an active role in shaping a landmark tourism destination on the Albanian Riviera.
Through disciplined project execution, engineering expertise, and commitment to quality, Tirana GC continues to deliver work that reflects European construction standards and modern development practices.
Project Information
- Project Category: Hotel
- Clients: David Malan
- Project Date: 25 June, 2024
- Avenue End Date: 08 July, 2024
- Locations: NewYork – 4648 Rocky, USA
- Price After: $10 Million
