T I R A N A G C

Loading....

Bloom Tower

At Bloom Tower, Dubai, Tirana General Contracting supported the project through a comprehensive range of construction and finishing services that contributed to both the technical performance and visual quality of the development. The scope of work required coordination across several disciplines, demonstrating the company’s ability to deliver integrated contracting services within a complex high-rise construction environment.

Structural Works

Tirana GC contributed to the project through selected structural works, supporting key building components that form part of the development’s structural framework. These works required strict adherence to engineering standards, ensuring the stability, durability, and structural reliability of the building while maintaining high levels of safety and construction discipline on site.

HVAC Installation

A significant part of the project scope involved HVAC installation, an essential system for maintaining indoor environmental comfort within modern high-rise developments. The works included the installation and integration of mechanical systems responsible for air conditioning and ventilation, ensuring efficient air circulation and climate control throughout designated areas of the building.

Electrical Services

The project also included a range of electrical installation works, contributing to the operational infrastructure of the tower. These services supported the building’s electrical distribution systems, lighting installations, and essential power connections, ensuring functionality, safety, and compliance with project specifications.

Flooring and Tile Installation

As part of the finishing phase, Tirana GC completed flooring and tile installation works, delivering high-quality surface finishes across various areas of the development. Precision in alignment, leveling, and material placement ensured durable and visually consistent flooring surfaces that contribute to both the aesthetics and functionality of the interior spaces.

Interior and Exterior Painting

To complete the finishing works, Tirana GC carried out interior and exterior painting services, applying high-performance coating systems designed to enhance the appearance and durability of the building. Interior painting focused on creating clean and refined finishes within the tower’s internal spaces, while exterior coatings were applied using materials suitable for long-term weather resistance and protection in Dubai’s climate conditions.



Project Information

  • Project Category: Apartments
  • Clients: David Malan
  • Project Date: 25 June, 2024
  • Avenue End Date: 08 July, 2024
  • Locations: NewYork – 4648 Rocky, USA
  • Price After: $10 Million

Download

Company Details

Download

Research File

Download

Do You Need Help? We're Here to Support You